Hitchen Group completed the new installation of a Building Energy Management System to operate and control the Heating, Ventilation and Air Conditioning systems. The hotel has a dictated PC with custom generated SCADA graphics for operating the plant at the hotel. The BEMS controls and monitors the Gas Fired Boilers, Hot Water Cylinder Tanks, Under-Flooring Heating, Air Handling Units, Ventilations Systems, Spa Rooms, Energy Monitoring and Metering.