GPO Exhibition Centre

GPO Exhibition Centre

Hitchen Group completed the new installation of a Building Energy Management System to operate and control the Heating, Ventilation and Air Conditioning systems and an Electrical metering system for the 90 meters. The GPO has a dictated PC with custom generated SCADA graphics for operating the plant in the GPO. The BEMS controls and monitors the Gas Fired Boilers, Hot Water Cylinder Tanks, Radiator Heating, Air Handling Units, Ventilations Systems, Energy Monitoring and Metering.

Share This