Hitchen Group completed the new installation of a Building Energy Management System to operate and control the Heating, Ventilation and Air Conditioning systems. The WPHC has a dictated PC with custom generated SCADA graphics for operating the plant at the health centre. The BEMS controls and monitors the Six Gas Fired Boilers, Hot Water Cylinder Tanks, Radiator Heating, Air Handling Units, Ventilations Systems, Energy Monitoring and Metering.